Florida › Hillsborough County

What it costs in government fees to build a home in Hillsborough County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Hillsborough County — itemized, sourced, and dated.

15 fees verified 12 source documents Compiled Jul 30, 2026

Your project

Total government fees $32,631 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $29,603 (Urban mobility district + Northwest utility service area) to $36,486 (Rural mobility district + South/Central utility service area).
Check the utility provider before you rely on thisThe county is split twice on two different maps — Urban/Rural for mobility fees, Northwest/South-Central for utilities. Every parcel falls in one of each.
Impact & mobility fees
FeeAmount
Mobility Fee — SF Detached 1,500–2,499 sf, Urban Assessment District Eff. Oct 1, 2022 · p.1 · source Rural district is $13,038. Replaced the transportation impact fee entirely. $9,183.00
School Total Impact Fees (countywide) — 1,800–2,499 sf Eff. Oct 1, 2022 · p.1 · source $8,227.00
Park Impact Fees — 2,000–2,499 sf Eff. Jan 1, 2022 · p.1 · source Charged at 65% of the study-justified rate. The full adopted rate is $3,300. $2,145.00
Fire Impact Fee — single family detached Eff. Oct 1, 2019 · p.1 · source $335.00
Subtotal$19,890
Water & sewer — Hillsborough County Water Resources
FeeAmount
Wastewater Impact Fees — single family, South/Central Eff. Mar 23, 2026 · Res. R25-111 sec 1.2 · source Northwest is $3,268.75. South/Central rises to $8,586 by 3/23/2029. $4,884.75
Water Impact Fees — single family, South/Central Eff. Mar 23, 2026 · Res. R25-111 sec 1.1 · source Northwest is $2,037.50. South/Central rises to $4,684 by 3/23/2027. $3,449.00
Accrued Guaranteed Revenue Fee — wastewater, residential Eff. Mar 23, 2026 · sec 1.3 p.3 · source $989.00
Accrued Guaranteed Revenue Fee — potable water, residential Eff. Mar 23, 2026 · sec 1.3 p.3 · source $833.00
Meter installation, 5/8" x 3/4" Eff. Mar 23, 2026 · sec 1.7 p.5 · source Drops to $215 on a pre-tapped connection. $350.00
Establish account and initial turn-on Eff. Mar 23, 2026 · sec 3.1 p.16 · source $25.00
Subtotal$10,531
Building permits, surcharges & other
FeeAmount
New Construction — FBC Occupancy R-3 Residential Eff. Oct 5, 2024 · p.1 · source $1.00 per sq ft of UNDER-ROOF area, minimum $380. Includes building, mechanical, electrical and plumbing disciplines — no separate trade permits. A real home with garage and lanai is 2,400–2,700 sf under roof. $2,000.00
DBPR surcharge, F.S. 468.631 (1.5%) Eff. Invalid Date · source $30.00
FL Building Code surcharge, F.S. 553.721 (1.0%) Eff. Invalid Date · source $20.00
Right-of-way base application + residential driveway Eff. Invalid Date · source Conditional — usually covered by the subdivision construction permit in a new plat. $100.00
Natural Resources — single family/duplex projects Eff. Jan 1, 2020 · p.1 · source Self-certification alternative is $32.30. $60.00
Subtotal$2,210

Mobility assessment district

Urban vs Rural drives a 42% swing in the mobility fee alone.

DistrictFee
Urban$9,183
Rural$13,038

Fees Hillsborough County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

How to use this. Every figure is transcribed from an official Hillsborough County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.

← Compare all Florida counties