Florida › Lake County

What it costs in government fees to build a home in Lake County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Lake County — itemized, sourced, and dated.

21 fees verified 12 source documents Compiled Jul 30, 2026

Your project

Total government fees $17,998 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $15,328 (West transportation district) to $18,426 (Northeast/Wekiva or South transportation district).
Check the utility provider before you rely on thisLake County's Board of County Commissioners does not own, operate, or charge for any water or wastewater utility. There is no county connection fee, capacity charge, or meter fee, because there is no county utility. Service comes from PSC-regulated private utilities, the Florida Governmental Utility Authority, municipal utilities extending outside city limits, or — for much of the rural county — private well and septic. The figure shown is the Florida Department of Health well and septic permit cost.
Impact & mobility fees
FeeAmount
School Eff. Oct 1, 2025 · pp.2-3 · source Ordinance 2023-39. The school fee steps every October 1; county fees step every January 2. $11,247.00
Roads — Central & North Central district Eff. Jan 2, 2026 · pp.2-3 · source ⚠ Ranges from $1,258 (West) to $4,356 (Northeast/Wekiva and South) for the identical house. Ordinance 2024-5. $3,928.00
Fire Eff. Jan 2, 2026 · pp.2-3 · source Ordinance 2023-53 as amended by 2024-5. $536.00
Parks Eff. Jan 2, 2026 · pp.2-3 · source Ordinance 2023-52. $263.00
Library Eff. Jan 2, 2026 · pp.2-3 · source Ordinance 2023-51. $263.00
Impact Fee Administrative — 3% capped at $100 Eff. Oct 1, 2025 · p.31 · source F.S. 163.31801. $100.00
Subtotal$16,337
Water & sewer — None — Lake County operates no water or sewer utility
FeeAmount
Private Residential Potable Well Construction — Florida DOH in Lake County Eff. Oct 1, 2025 · Exhibit J, pp.22-24 · source Lake is one of 42 Florida counties where the onsite sewage program is still administered by the county health department. $100.00
OSTDS New System (septic) — Florida DOH in Lake County Eff. Oct 1, 2025 · Exhibit J, pp.22-24 · source ⚠ No site evaluation line appears in Exhibit J, though F.S. 381.0066(2) contemplates one at $40-$115. The true out-the-door septic cost may exceed $75. $75.00
Subtotal$175
Building permits, surcharges & other
FeeAmount
Residential Building Permit — includes administration, plan review and inspections Eff. Oct 1, 2025 · Exhibit B, pp.4-9 · source $0.26 per sq ft of area UNDER ROOF. Shown at 2,600 sf. Impact fees use living area; the permit uses under-roof area — two different square footages in one stack. $676.00
Zoning Permit — single family and accessory dwelling unit Eff. Oct 1, 2025 · p.34 · source $110.00
Residential Trade Permit — Electrical Eff. Oct 1, 2025 · Exhibit B · source $0.03/sq ft with a $100 minimum. The minimum binds for any home under 3,333 sf under roof. $100.00
Residential Trade Permit — Plumbing Eff. Oct 1, 2025 · Exhibit B · source $100.00
Residential Trade Permit — Mechanical Eff. Oct 1, 2025 · Exhibit B · source $100.00
Residential Site Development Final Inspection Eff. Oct 1, 2025 · p.44 · source Do not also add Code Enforcement's $78.50 landscape compliance inspection — Public Works absorbed it into this fee. $100.00
Residential Site Development Review Eff. Oct 1, 2025 · p.44 · source This Public Works block is the county's stormwater and drainage charge for a single lot, required for MS4 compliance. $90.00
Residential Site Development Pre-Grade Inspection Eff. Oct 1, 2025 · p.44 · source $75.00
Access Connection — residential driveway apron Eff. Feb 1, 2026 · source $50.00
Residential Trade Permit — Low Voltage Eff. Oct 1, 2025 · Exhibit B · source Appears on essentially every new home but sits among change-out items on the schedule with nothing tying it to new construction. $40.00
Address Assignment (911) Eff. Oct 1, 2025 · p.39 · source $20.00
DBPR surcharge, F.S. 468.631 (1.5%) Eff. Invalid Date · source ⚠ Inferred from statute. The surcharges appear nowhere in Lake County's 54-page fee schedule, permit application, or checklist, and the public permit database's fee field excludes them. $15.24
Building Code surcharge, F.S. 553.721 (1.0%) Eff. Invalid Date · source ⚠ Same caveat as above. $10.16
Subtotal$1,486

Transportation benefit district

Four districts. Only the road fee varies, and it ranges 3.5x — a $3,098 swing, 23% of the total stack.

DistrictFee
West$1,258
Central & North Central$3,928
Northeast / Wekiva$4,356
South$4,356

Fees Lake County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

How to use this. Every figure is transcribed from an official Lake County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.