What it costs in government fees to build a home in Manatee County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Manatee County — itemized, sourced, and dated.

12 fees verified 16 source documents Compiled Jul 30, 2026

Your project

Total government fees $40,017 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $39,642 (developer-installed service connection) to $42,513 (true 3/4" meter instead of the standard 5/8" x 3/4").
Impact & mobility fees
FeeAmount
Alternative Transportation System — SFD, 1,701 sq ft or more Eff. Sep 9, 2025 · p.1 · source Identical in all four transportation benefit districts (NE/NW/SE/SW). $19,768.00
Educational Facilities Impact Fee — 1,701–2,200 sq ft Eff. Sep 9, 2025 · Ord. 24-22 sec 2-29-85(a) · source ⚠ Steps to $8,424 on 9/9/2026 and $9,190 on 9/9/2027. Fees are assessed at Certificate of Occupancy, not permit — a home COing after 9/9/2026 pays the higher rate. $7,658.00
Parks & Natural Resources Eff. Sep 9, 2025 · p.1 · source $4,404.00
Law Enforcement Eff. Sep 9, 2025 · p.1 · source $986.00
Libraries Eff. Sep 9, 2025 · p.1 · source $419.00
Public Safety (fire/EMS) Eff. Sep 9, 2025 · p.1 · source There is no separate fire impact fee. Independent fire districts charge only site-plan review fees. $345.00
Admin Surcharge Eff. Sep 9, 2025 · p.1 · source $295.00
Subtotal$33,875
Water & sewer — Manatee County Utilities
FeeAmount
Facility Investment Fee — Wastewater, residential 5/8" x 3/4" Eff. Oct 1, 2019 · source ⚠ A true 3/4" meter is $4,762. Most single-family homes get 5/8" x 3/4"; reading the 3/4" row overstates the pair by $2,456. $3,175.00
Facility Investment Fee — Potable Water, residential 5/8" x 3/4" Eff. Oct 1, 2019 · source Connection and line fees are NOT indexed under R-23-058 sec 12, so they hold at their adopted amounts. $1,738.00
Connection fee, 5/8" x 3/4" — county-installed service Eff. Jun 1, 2023 · R-23-058 sec 3, p.3 · source Actual cost with a $675 minimum. Developer-installed is $300 minimum. Meter installation is inside this fee, not separate. $675.00
Subtotal$5,588
Building permits, surcharges & other
FeeAmount
New Residential — construction of a new residential structure Eff. Apr 1, 2023 · p.3 · source $0.27 per square foot. Plan review and all electrical, mechanical and plumbing work are included — there are no separate trade permits. $540.00
State surcharges — combined 2.5% on all permits, minimum $4 Eff. Invalid Date · source F.S. 468.631 at 1.5% ($8.10) plus F.S. 553.721 at 1.0% ($5.40). $13.50
Subtotal$554

School impact fee phase-in (still running)

County impact fees have NO remaining phase-in — Ordinance 25-15 struck out the previously adopted Phases 2, 3 and 4. Only the school fee still steps.

PhaseImpact fees
Now — through 9/8/2026$33,875
CO on/after 9/9/2026$34,641
CO on/after 9/9/2027$35,407

Fees Manatee County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

How to use this. Every figure is transcribed from an official Manatee County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.