Florida › Polk County

What it costs in government fees to build a home in Polk County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Polk County — itemized, sourced, and dated.

20 fees verified 14 source documents Compiled Jul 30, 2026

Your project

Total government fees $29,959 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $29,301 (Transportation District C (South)) to $32,044 (certificate of occupancy on or after Jan 1, 2027 — Phase Three rates).
Check the utility provider before you rely on thisPolk County Utilities serves roughly 68,000 accounts — not all of unincorporated Polk. Large areas are on private well and septic, private utilities, or other authorities. Verify service availability by parcel.
Impact & mobility fees
FeeAmount
Educational System Eff. Jan 1, 2026 · source Phase Two. Rises to $12,187 on 1/1/2027. $11,124.00
Transportation — District A (Northeast) Eff. Jan 1, 2026 · source District B $3,640, District C $3,052. Rises to $4,103 on 1/1/2027. $3,710.00
Parks and Recreational Eff. Jan 1, 2026 · source Rises to $1,864 on 1/1/2027. $1,381.00
Law Enforcement Eff. Jan 1, 2026 · source No change scheduled. $578.00
Correctional Facilities Eff. Jan 1, 2026 · source Rises to $662 on 1/1/2027. $516.00
Fire Rescue Eff. Jan 1, 2026 · source No change scheduled. $377.00
Library Eff. Jan 1, 2026 · source No change scheduled. $188.00
Emergency Medical System (EMS) Eff. Jan 1, 2026 · source No change scheduled. $153.00
Subtotal$18,027
Water & sewer — Polk County Utilities
FeeAmount
Connection Fee — Wastewater, single-family detached Eff. Oct 1, 2025 · source Unchanged in the published Oct 1, 2026 column. Lot size does not change the SFD rate. $6,169.00
Connection Fee — Water, single-family detached Eff. Oct 1, 2025 · source Unchanged in the published Oct 1, 2026 column. $3,038.00
Meter Installation — 3/4" meter Eff. Oct 1, 2025 · source $800.00
New Account — next working day service Eff. Oct 1, 2025 · source Refundable deposits of $90 water and $210 sewer are excluded as they are not fees. $55.00
Subtotal$10,062
Building permits, surcharges & other
FeeAmount
Combined Single Family Residential Permit Fee Eff. Jul 3, 2017 · Exhibit A p.3 · source $0.30 per sq ft of area UNDER ROOF. Covers building, plumbing, electrical and a/c permits — adding separate trade permits overstates by $255–$340. Shown at 2,500 sf under roof. $750.00
Interim Fire Assessment — July permit issuance Eff. Oct 1, 2025 · source $393 annual rate x a month-of-issuance factor. Factors exceed 1.0 because they cover the balance of the current fiscal year plus the next full year. Due at permit issuance. $556.88
Interim Residential Waste Assessment — January CO Eff. Oct 1, 2025 · source $346.05 annual rate x a month-of-CO factor. Due at certificate of occupancy. $231.85
Residential Plan Review Fee Eff. Jul 3, 2017 · source Greater of $55 or 25% of the building permit fee. $187.50
Driveway, single access Eff. Jul 3, 2017 · source $105.00
Land Use Fee Eff. Jul 3, 2017 · source $20.00
DBPR surcharge, F.S. 468.631 (1.5%) Eff. Invalid Date · source $11.25
Building Code surcharge, F.S. 553.721 (1.0%) Eff. Invalid Date · source $7.50
Subtotal$1,870

Transportation impact fee district

Only transportation varies geographically. The three park districts exist for trust-fund accounting only — the parks rate is uniform countywide.

DistrictFee
District A (Northeast)$3,710
District B (Northwest)$3,640
District C (South)$3,052

Adopted phase-in — rate is set at PAYMENT, not at permit

Impact fees are due prior to Certificate of Occupancy and calculated at the rate in effect at time of payment. A home permitted in 2026 but COing in 2027 pays Phase Three.

PhaseImpact fees
Phase Two — now, through 12/31/2026$18,027
Phase Three — from 1/1/2027$20,112

Fees Polk County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

How to use this. Every figure is transcribed from an official Polk County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.