Florida › St. Johns County

What it costs in government fees to build a home in St. Johns County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated St. Johns County — itemized, sourced, and dated.

25 fees verified 13 source documents Compiled Jul 30, 2026

Your project

Total government fees $34,294 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $33,139 (pre-run water service instead of a new tap) to $36,544 (if the $2,250 Sewer Infrastructure Charge applies).
Check the utility provider before you rely on thisJEA serves portions of northern St. Johns County under its own fee schedule. The county publishes no service-area boundary map.
Impact & mobility fees
FeeAmount
Multimodal Transportation Impact Fee Eff. Mar 4, 2026 · Phase 1 table p.1 · source Renamed from 'Roads' by Ord. 2025-45. Bracket: 1,801–2,500 sq ft heated. $12,015.00
Schools Eff. Mar 4, 2026 · Phase 1 table p.1 · source $6,082.00
Parks Eff. Mar 4, 2026 · Phase 1 table p.1 · source $1,906.00
Public Buildings Eff. Mar 4, 2026 · Phase 1 table p.1 · source Library capital sits inside this fee; there is no separate library impact fee. $968.00
Fire Rescue Eff. Mar 4, 2026 · Phase 1 table p.1 · source $764.00
Law Enforcement and Correctional Facilities Eff. Mar 4, 2026 · Phase 1 table p.1 · source $452.00
Conservation and Open Space Eff. Mar 4, 2026 · Phase 1 table p.1 · source New fee under Ord. 2025-45. Starts at 50% of recommended maximum, steps +12.5%/yr for four years. $303.00
Subtotal$22,490
Water & sewer — St. Johns County Utility Department
FeeAmount
Sewer Unit Connection Fee, per dwelling Eff. May 1, 2026 · Schedule A p.3 · source $5,905.25
Water Unit Connection Fee, single or multiple family Eff. May 1, 2026 · Schedule A p.3 · source $2,926.95
Water & Reclaimed Water Tapping Fee, 3/4" Eff. May 1, 2026 · Schedule F(1) p.16 · source Drops to $240 where the developer already ran the service (common in platted subdivisions). $1,395.00
Locate / Right-of-Way Fee Eff. May 1, 2026 · Schedule F(1) p.16 · source $75.00
New Service Charge (account establishment) Eff. May 1, 2026 · Schedule H item 1, p.18 · source $30.00
Subtotal$10,332
Building permits, surcharges & other
FeeAmount
Building Permit Fee Eff. Jul 21, 2026 · pp.19-20 · source $246 + $1.58 per $1,000 over $100,000. Shown at $300,000 valuation. $562.00
Plan Check Fee Eff. Jul 21, 2026 · pp.19-20 · source Exactly 50% of the building permit fee. $281.00
Permit Issuance Fee Eff. Jul 21, 2026 · pp.19-20 · source $14.00
FL BCAIB Surcharge, F.S. 468.631 (1.5%) Eff. Invalid Date · source Base is issuance + plan check + permit fee combined — a definition published nowhere, which raises the surcharge ~53% over the naive reading. $12.86
FL DBPR Surcharge, F.S. 553.721 (1.0%) Eff. Invalid Date · source $8.57
Electrical permit Eff. Jul 21, 2026 · source Wiring $24 + main service panel 0-150A $48 + issuance $11 + both surcharges at $2 minimum $87.00
Plumbing permit Eff. Jul 21, 2026 · source 12 fixtures at $4 + sewer $4 + water heater $1.90 + issuance $11 + surcharges $68.90
Mechanical permit Eff. Jul 21, 2026 · source New HVAC $24 + minimum top-up $10 + issuance $11 + surcharges $49.00
Residential Lot Grading (includes first inspection) Eff. Jul 21, 2026 · pp.24-25 · source Isolated single- and two-family dwellings are exempt from separate stormwater permitting. $104.00
Clearing & Tree Preservation — single family lots Eff. Jul 21, 2026 · pp.24-25 · source Drops to $26 under an approved Neighborhood Site Plan. $104.00
Environmental Clearance Sheet & Inspection Eff. Jul 21, 2026 · pp.24-25 · source Drops to $27 under an approved Neighborhood Site Plan. $82.00
Clearance Sheet Processing Fee Eff. Jul 21, 2026 · pp.24-25 · source $62.00
Single Family Residential Driveway Permit Eff. Jul 21, 2026 · pp.24-25 · source $36.00
Subtotal$1,471

Adopted five-phase schedule (impact fees only)

Ordinance 2025-45 eliminated automatic CPI indexing, so Phase V is terminal absent new action.

PhaseImpact fees
Phase I — now (3/4/2026)$22,490
Phase II — 3/4/2027$24,106
Phase III — 3/4/2028$24,513
Phase IV — 3/4/2029$24,918
Phase V — 3/4/2030$24,994
What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

How to use this. Every figure is transcribed from an official St. Johns County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.